 |
| STOL CH750 |
|
|
|
STOL CH750 QUICK BUILD KIT
$ 32,500.00*
FUSELAGE The fuselage is completely assembled. All interior surfaces are primed with epoxy chromate primer before assembly. Control stick and flaperon bell crank is installed. You must attach and align the wing, wing struts, and horizontal stab. You need to install your doors, front windshield and top window. Landing gear, wheels and brakes are the owner's responsibility. Rudder pedals, Control cables, fuel system and electrical are the responsibility of the owner. WINGS
The wings are completely assembled with standard fuel tanks installed. All interior surfaces are primed with epoxy chromate primer before assembly. The leading edge slat mounts have been fabricated, aligned, and installed on the ribs. Conduit for Nav/Strobe electrical is mounted in the wing. The fiberglass tip & wing tip sheeting is left un-riveted. SLATS / FLAPERONS The leading edge slats are jig built and finished. They are ready to join and mount on the wing. The flaperons are built and must be joined and hinged. All interior surfaces are primed with epoxy chromate primer before assembly. TAIL SURFACES The horizontal stabilizer is assembled. The elevator is assembled. The rudder is NOT assembled. All interior surfaces are primed with epoxy chromate primer before assembly. You must hinge and mount all the above surfaces. In addition the elevator must be cut for rudder clearance. FINISHING KIT Included in above price. Some parts of the control system are installed.
The builder is left with approximately 250 hours of labor to complete the airframe.
Engine, electrical, paint, interior, final assembly, weight and balance, & final inspection are the responsibility of the owner.
*All prices in U.S. Funds Availability, Prices and Conditions subject to change without prior notice. Plus crating, shipping and handling from Zephyrhills, Florida. Copyright: Zenith Distributing, LLC. 2010
|
Call us at 813-690-1916 for more information.
|
|